Levelling Up Fund: Ruthin Clock Tower

Funded by UK Government logo

Project background

Project background

This project is part of the Levelling Up funding to deliver projects that will protect Ruthin’s unique Heritage, wellbeing and Rural Communities. The theme is to improve connectivity for walking and cycling in and around Ruthin and complement investment in activities to boost its heritage and cultural value. The interventions proposed focus on public realm enhancements, widening the scope for hosting events and revitalising historical buildings and landmarks to support local identity, promote pride of place and boost the image of the town.

This project focuses on improvements to the Grade II listed Clock Tower in St. Peter’s Square, Ruthin, which was completed in 1883 and is a memorial to the 83 year old Joseph Peers.

The project proposes to restore the clock. The aim is not to change it: good conservation work is not about drastic change and is often not obvious to many passers-by, but it will ensure it can continue in a good condition into the future.

The expected deliverables are rehabilitation of the historic structure and clock face:

  • Restore the clock-dials of the clock tower, and
  • Replace the dial with stainless-steel fixings for longevity
Key points

Key points

This is a new project to deliver restoration improvements to Ruthin clock tower

The project compliments the improvements proposed for St. Peter’s Square and Cae Ddol Park

The project is due to be completed by March 2025

Current position

Current position

Restoration is now in progress. Works are being carried out by Rory Moore Building Conservation Ltd. – Historic Building Conservation and Stone Masonry.

Consultation

Consultation

As part of the project development undertaken by the Ruthin Clock Committee there was an exhibition about the structure and the proposed conservation approaches.

This was available for people to view for just over two weeks in The Old Courthouse, Ruthin, along with someone to discuss the proposals with.

The exhibition was also on display in Ruthin Library for two weeks.

Frequently Asked Questions

Frequently Asked Questions

Why does the clock need to be restored?

The current condition of the clock building is concerning. While structurally it is still sound, the stonework/masonry on the exterior of the structure is deteriorating due to the effects of weather and general decay, while plants, moss and dirt are visibly covering some large parts of the stonework. There are numerous visible dents, cracks and markings on the exterior of the clock and the water trough has had a large impact on it at some point, with parts of the stonework having split off. The electrical supply in the clock is very dated and requires upgrading to modern standards.

Who decided that the clock needs to be restored?

The Ruthin Clock Tower Committee is a constituted community group created in February 2021 with the intention of restoring the town clock to as close as possible to its original condition and preserve it for future generations. The Committee was supported by Ruthin Town Council. The committee is made up of volunteers with different types of expertise including local historians, qualified archaeologists, surveyors and building specialists, residents with expertise in funding and historical renovations, to name a few skills.

The committee fully recognizes the current condition of the town clock and have identified the need for restoring the town clock’s stonework and upgrading the structure’s electrical supply (located in the interior of the clock).

Will any other work be carried out around the clock tower?

This project focusses on restoring the clock tower to ensure it can continue in a good condition into the future.

The expected deliverables are rehabilitation of the historic structure and clock face:

  • Restore the clock-dials of the clock tower, and
  • Replace the dial with stainless-steel fixings for longevity

When is the restoration due to start as Gwŷl Rhuthun takes place in the area at the end of June?

St Peter’s Square construction is due to start on site in July 2024, with the clock tower restoration being carried out at the same time. No works will commence before Gwŷl Rhuthun has taken place at the end of June.

Will access to St Peter’s Square still be available during the works?

There will inevitably be some disruption during the construction phase. We are encouraging all businesses to share their views at this early stage, so that we can take on board their concerns when we review the phasing of the restoration works. This will help to inform the way in which we need to do the works and the notice periods and communication that we need to provide to businesses.

Will the funding be used for anything else?

While the capital funds for the project are now secured, the restoration committee wants a community heritage project to run alongside the actual works to the clock. This would involve an entire series of community events and activities during 2024-25, with the clock committee working with Ruthin Town Council and other local groups such as Ruthin Local History Society, Ruthin and District Civic Association, Ruthin Festival and others. More information to follow.